Process Description

In this process step, the goals defined in steps 1.1 and 2.1 must be reviewed using the selected technologies from step 2.2 - 2.4. If the objectives are not met, they should be checked for feasibility. If the targets need to be adjusted, repeat steps 2.2 - 2.4.In addition, a rough profitability analysis should be prepared regarding the construction budget for the planned technologies.All conclusions and findings from 2.1 - 2.4 should be noted in a short summary.

Process Delivery

D2.5.1 Summary / energy assessment

Output

Guideline